Implementing Six Sigma: Smarter Solutions Using Statistical Methods, Second Edition
- 32h 36m 51s
- Forrest W. Breyfogle III
- Gildan Media
- 2019
This new and significantly revised edition of Implementing Six Sigma goes well beyond traditional Six Sigma methodologies, introducing an enhanced roadmap - S4/IEE (Smarter Six Sigma Solution ssm/Integrated Enterprise Excellence). This cutting-edge approach offers a solution to the common problem of sustaining Six Sigma activities and downplays the traditional policy stating that Six Sigma projects must have a defined defect. A variety of plans, checklists, metrics, and warnings of potential pitfalls provide thorough preparation for anyone implementing Six Sigma strategies.
With new coverage of Six Sigma infrastructure building, benchmarking, and real-world "lessons learned", this second edition is the best available tool for implementing these powerful, profit-building strategies.
In this Audiobook
-
1. Six Sigma Overview and S4/IEE Implementation
-
2. Voice of the Customer and S4/IEE Define Phase
-
3. Measurements and the S4/IEE Measure Phase
-
4. Process Flowcharting/Process Mapping
-
5. Basic Tools
-
6. Probability
-
7. Overview of Distributions and Statistical Processes
-
8. Probability Plotting and Hazard Plotting
-
9. Six Sigma Measurements
-
10. Basic Control Charts
-
11. Process Capability and Process Performance Metrics
-
12. Measurement Systems Analysis
-
13. Cause-and-Effect Matrix and Quality Function Deployment
-
14. FMEA
-
15. Visualization of Data
-
16. Confidence Intervals and Hypothesis Tests
-
17. Inferences: Continuous Response
-
18. Inferences: Attribute (Pass/Fail) Response
-
19. Comparison Tests: Continuous Response
-
20. Comparison Tests: Attribute (Pass/Fail) Response
-
21. Bootstrapping
-
22. Variance Components
-
23. Correlation and Simple Linear Regression
-
24. Single-Factor (One-Way) Analysis of Variance (ANOVA) and Analysis of Means (ANOM)
-
25. Two-Factor (Two-Way) Analysis of Variance
-
26. Multiple Regression, Logistic Regression, and Indicator Variables
-
27. Benefiting from Design of Experiments (DOE)
-
28. Understanding the Creation of Full and Fractional Factorial 2 DOEs
-
29. Planning 2 DOEs
-
30. Design and Analysis of 2 DOEs
-
31. Other DOE Considerations
-
32. Robust DOE
-
33. Response Surface Methodology
-
34. Short-Run and Target Control Charts
-
35. Control Charting Alternatives
-
36. Exponentially Weighted Moving Average (EWMA) and Engineering Process Control (EPC)
-
37. Pre-Control Charts
-
38. Control Plan, Poka-Yoke, Realistic Tolerancing, and Project Completion
-
39. Reliability Testing/Assessment: Overview
-
40. Reliability Testing/Assessment: Repairable System
-
41. Reliability Testing/Assessment: Nonrepairable Devices
-
42. Pass/Fail Functional Testing
-
43. S4/IEE Application Examples
-
44. Lean and its Integration with S4/IEE
-
45. Integration of Theory of Constraints (TOC) in S4/IEE
-
46. Manufacturing Applications and a 21-Step Integration of the Tools
-
47. Service/Transactional Applications and a 21-Step Integration of the Tools
-
48. DFSS Overview and Tools
-
49. Product DFSS
-
50. Process DFSS
-
51. Change Management
-
52. Project Management and Financial Analysis
-
53. Team Effectiveness
-
54. Creativity
-
55. Alignment of Management Initiatives and Strategies with S4/IEE